The Iron Age Farm
The Iron Age Farm at Ullandhaug received 135 metres of grating for walkways between its buildings. The photographs show vegetation growing around the gratings after installation in 2018.
Read article →INSIGHTS & NEWS
News, project deliveries and developments from Glassfiber Produkter.
The Iron Age Farm at Ullandhaug received 135 metres of grating for walkways between its buildings. The photographs show vegetation growing around the gratings after installation in 2018.
Read article →Glassfiber Produkter supplied a vehicle bridge over Frøylandsbekken at Kvernaland. It replaced an old wooden bridge and provided access during construction work in the area.
Read article →In 2020, Glassfiber Produkter marked 20 years since its foundation. The anniversary year included a new identity, a new website and investment in premises at Klepp stasjon.
Read article →Fiberglass walkways, stairs, railings and security gates were supplied for Evensen & Evensen’s project at Jørstadmoen military camp. Low weight was important for the rooftop walkway.
Read article →Glassfiber Produkter designed, prefabricated and installed a GRP platform for a Volvo excavator intended for use on a boat. The platform is built from structural profiles and gratings.
Read article →Ostasteidn rest area by Sandsfjorden features walkways, benches and several custom fiberglass solutions. The project shows how the material can be integrated into architecture and landscape.
Read article →Tonstad Power Plant received 28 prefabricated stair modules with cable support. The project included design, calculations, fabrication and installation in a 164-metre cable shaft.
Read article →A 20-metre seawater dump caisson was designed, fabricated and delivered for the Alvheim development in 2006. The delivery included the GRE pipe and its steel structure.
Read article →Hitec Products AS received 200 m² of Offshore Grating and protection sleeves for its Johan Sverdrup project. The delivery includes grating article 15513.
Read article →Fiberglass gratings form the deck of a suspension bridge at Kvitlen in Sirdal. The delivery to Stavanger Tourist Association is part of improvements along the hiking route.
Read article →Aker Solutions in Egersund received 1,500 m² of GRP grating for the Aasgard Gas Compression project. The gratings form part of a subsea protection structure.
Read article →In 2011, approximately 300 metres of fixed and removable railings were supplied for Mantena’s train workshop at Sundland. The system was adapted for maintenance and repair of Flirt trains.
Read article →