Tailored fiberglass solutions for Ardyne AS
Ardyne AS has used fiberglass for a test chamber, workshop areas and an acid-bath solution. The collaboration shows how practical workshop needs become tailored solutions.
Read article →INSIGHTS & NEWS
News, project deliveries and developments from Glassfiber Produkter.
Ardyne AS has used fiberglass for a test chamber, workshop areas and an acid-bath solution. The collaboration shows how practical workshop needs become tailored solutions.
Read article →The Iron Age Farm at Ullandhaug received 135 metres of grating for walkways between its buildings. The photographs show vegetation growing around the gratings after installation in 2018.
Read article →Glassfiber Produkter supplied a vehicle bridge over Frøylandsbekken at Kvernaland. It replaced an old wooden bridge and provided access during construction work in the area.
Read article →In its anniversary year of 2020, Glassfiber Produkter moved into new premises at Klepp stasjon. Offices, workshop and warehouse were brought together under one roof.
Read article →Gratings, railings, stairs and protective frames in fiberglass were supplied for Kvaleberg workshop in Stavanger. The delivery formed part of the new train workshop project in 2019.
Read article →In 2020, Glassfiber Produkter marked 20 years since its foundation. The anniversary year included a new identity, a new website and investment in premises at Klepp stasjon.
Read article →Fiberglass walkways, stairs, railings and safety gates were supplied for Evensen & Evensen’s project at Jørstadmoen military camp. Low weight was important for the rooftop walkway.
Read article →Glassfiber Produkter designed, prefabricated and installed a GRP platform for a Volvo excavator intended for use on a boat. The platform is built from structural profiles and gratings.
Read article →Ostasteidn rest area by Sandsfjorden features walkways, benches and several custom fiberglass solutions. The project shows how the material can be integrated into architecture and landscape.
Read article →Tonstad Power Plant received 28 prefabricated stair modules with cable support. The project included design, calculations, fabrication and installation in a 164-metre cable shaft.
Read article →A 20-metre seawater dump caisson was designed, fabricated and delivered for the Alvheim development in 2006. The delivery included the GRE pipe and its steel structure.
Read article →Hitec Products AS received 200 m² of Offshore Grating and protection sleeves for its Johan Sverdrup project. The delivery includes grating article 15513.
Read article →