GRP raised access floor

A raised floor with a GRP frame and solid-surface panels, developed as a project-specific concept for technical installations beneath the floor.

Concept illustration of a GRP raised floor with yellow panels and a braced frame
Concept illustration. Final construction, dimensions and fixings are defined for the project.

Space for installations beneath the floor

A raised floor can accommodate technical services beneath a continuous floor surface. The concept provides a starting point for planning space, access and openings around the installations.

The solution is assessed for technical rooms and other installation areas where a raised GRP floor may be appropriate. Floor height, panel layout and access for operation and maintenance must suit the application.

HOW THE CONCEPT IS BUILT

Panels, frame and supports

01

Solid-surface panels

The floor surface is based on item 15040. Panel dimensions, cutting, openings and access arrangements are defined during engineering.

02

Load-bearing GRP frame

Profiles and bracing support the panels. Profile selection and spans must be assessed against loads and deflection requirements.

03

Supports and fixings

Posts, feet and connections are coordinated with the supporting surface. Fixings, levels and building interfaces form part of the overall design.

The illustration shows a concept, not a fully engineered standard product. Capacity and suitability must be documented for the selected construction.

BEFORE THE SOLUTION IS SPECIFIED

Project requirements determine the design

We consider the floor as a complete system, from panels to supports and technical installations.

Dimensions and clear height

Floor area, finished level, available underfloor height, doors and transitions.

Loads and deflection

Point loads, distributed loads, equipment and any transport across the floor.

Access and service routes

Cable and equipment locations, openings and any need for removable panels.

Environment and materials

Moisture, temperature, any chemical exposure and surface requirements.

Electrical properties

Insulation, earthing and electrostatic discharge (ESD) requirements must be specified and documented for the solution.

Fire and documentation

Project fire and smoke requirements, relevant standards, calculations and product documentation.

GRP alone does not establish that a floor system meets ESD, fire or data-centre requirements. These requirements are assessed separately before selecting materials and the system.

From initial sketch to an agreed scope

01

Describe the need

Send a plan or sketch with dimensions, intended use, loads and service routes.

02

Clarify and engineer

We assess materials, construction and interfaces. Drawings and required documentation are agreed before production.

03

Manufacture and deliver

Machining, assembly, transport and any installation support are included according to the agreed scope.

Explore our services →

Consider the wider installation

The raised floor must work with cable routes, access and the surrounding structures. Explore related solutions as you plan the project.

Planning a raised access floor?

Tell us where the floor will be used, approximate dimensions and height, expected loads and the installations it must accommodate. Include known fire, electrical and documentation requirements.