Skip to Content

NEWS

SP Cable ducts delivered to Bane NOR

Bane NOR received 400 metres of SP cable duct with lids for the Loenga–Bekkelaget project. The system was installed by Team Anleggsservice AS.

SP Cable ducts delivered to Bane NOR

400m SP cable duct w/lid delivered to the route management project, Loenga – Bekkelaget, Bane NOR. Installed by Team Anleggs service AS.

SP Cable duct

The SP series products are specifically designed for installations along railway lines, especially in areas where it is not possible to bury cable ducts. This makes them ideal for demanding infrastructure projects with limited accessibility or challenging terrain. The solutions are designed to withstand high loads, weathering and long-term exposure to harsh environments, while ensuring safe and stable cable routing.

Production is carried out using profile drawing, an efficient method that provides products with high strength, consistent quality and long service life. This process makes it possible to produce profiles with precise dimensions and good mechanical properties, adapted to the requirements of the railway sector.

  • Self-supporting
  • Distance of up to 6 m between supports
  • Can be installed by 1 person

Read more about our kcable management system here.

SP Cable ducts delivered to Bane NOR
train
train track

Related solutions and products: Rail

← All news