Grating for Gina Krog and Mariner

Chinagrate Composite Structures has signed a contract with DSME (Daewoo Shipbuilding & Marine Engineering CO., Ltd) in South Korea for delivery of gratings and stair treads to Statoil projects Gina Krog and Mariner. Overall it will be delivered 9,000 square meters grating distributed 2500 Gina Krog and 6500 to Mariner. Grating profile based on phenol as binder, have exterior UV-resistant coating and is electrically conductive to avoid static buildup. The Grating is tested and certified according to EN 13463-1-2001 “Non- electrical equipment for potentially explosive atmospheres per EN 50014:1997”.

Production is underway and will be completed during the first half of 2015.

Relaterte innlegg

Fish farming facility expands with fiberglass

Fish farming facility expands with fiberglass

Tailored structures in fiberglass have been designed, manufactured and delivered to Hofseth Aqua's facility in Tafjord. The fish farming plant has been built out with a new section for post smolt, and will be part of the company's investment in trout production. With...

Choosing gratings

Choosing gratings

Glassfiber Produkter carries a wide range of different types of gratings. Among all the gratings we have, it can be a challenge to find the right type which suits your needs. Which grate you should choose depends on what, where and how it will be used. This article...

Fiberglass strainer and walkways to Bulandet

Fiberglass strainer and walkways to Bulandet

At the far end of the coast on one of Norway's westernmost points lies Bulandet, a group of islands, islets and reefs. By the sea Bulandet Miljøfisk's new pilot fish farming facility is being built on land. Glassfiber Produkter is proud to have supplied walkways,...